The Panama Blog

Panama Travel and Living

  • Panama Travel
    • Panama Travel Guide
    • Panama Tours
    • Panama Hotels
    • Panama City Travel
    • Bocas Del Toro Travel
    • Boquete Travel
  • Living In Panama
    • Bocas Del Toro Living
    • Boquete Living
    • Casco Viejo
    • Chiriqui Living
    • Moving To Panama
    • Panama City Living
    • Panama Real Estate
    • Retire In Panama
    • Teaching English in Panama
  • Things To Do In Panama
    • Panama Beaches
    • Panama Dining and Restaurants
    • Panama Nightlife and Entertainment
    • Panama Sports And Outdoors
    • Panama Surfing
    • Shopping In Panama

Panama Shows Off First Metro System in Central America

03/03/2014 By Panama Eric

(Hispanically Speaking News) The consortium made up of Spanish construction group FCC and Brazilian engineering giant Odebrecht has delivered Line 1 of Panama City’s metro system, the first of its kind in Central America, wrapping up a project that took 41 months to complete and cost $2.01 billion.

The new metro was unveiled in a ceremony Friday at the headquarters of Panama’s Metro Secretariat, officials told Efe.

The metro system’s Line 1 was initially intended to stretch for 13.7 kilometers (8.5 miles) and include 13 stations, both above and below ground, but a pair of kilometers and two stations were later added, raising the price by $211.6 million, officials confirmed Friday.

Financing for the project has come from Citibank, the Inter-American Development Bank, the Andean Development Corporation, known as the CAF, and the Panamanian Economy and Finance Ministry.

Additional support has been provided by institutions such as French export credit agency Coface, Spain’s Cesce and the Multilateral Investment Guarantee Agency, the political risk insurance arm of the World Bank Group.

The trains were built at French multinational Alstom’s plant in Barcelona.

The trains will consist of three cars initially, though they have a five-car capacity. Each has air conditioning, video monitoring equipment, passenger information systems and designated seating for the disabled.

Once it reaches full operating capacity between May and June, Line 1 will be able to transport up to 30,000 people an hour in both directions.

Filed Under: Panama Travel

  • Home
  • About
  • Contact
  • Privacy Policy